The short answer
In unincorporated Orange County, replacing cabinets or countertops in the same location, without changing the layout, generally does not need a permit. Remodeling, electrical, plumbing, mechanical and structural work generally does in Orange County, and the City of Orlando requires permits for electrical, plumbing, gas and most construction projects. Rules depend on where your home is, so confirm with your city or county building department before work starts.
Which building department covers your home?
“Orlando” on a mailing address does not always mean the City of Orlando. Many homes with an Orlando address are in unincorporated Orange County, and nearby cities such as Winter Garden, Winter Park or Kissimmee run their own building departments. The department that issues permits for your address is the one whose rules apply. Your property record or a call to the county will tell you which it is.
What does Orange County say about replacing cabinets?
Orange County’s permitting FAQ lists projects that generally do not need a permit. The list includes “replacing cabinets or countertops in the same location (without changing the layout)”, along with painting and replacing flooring.
The same page is clear about the other side: most construction, remodeling, electrical, plumbing, mechanical and structural work does require a permit, and work that alters a building or its systems typically needs one before it begins, as required by the Florida Building Code.
What about the City of Orlando?
The City of Orlando’s residential permitting page states that trade permits are required for electrical, plumbing, gas and other applicable work, and that permits are required for most construction projects. The city pages we reviewed do not list cabinet replacement specifically, so if your home is inside city limits, confirm your project with the city before work starts.
What changed in Florida in July 2026?
A state law, HB 803, created a new exemption for some residential work. According to the City of Orlando’s residential building permit exemption guide, effective July 1, 2026, owners and contractors of single-family homes may be exempt from a building permit for work valued at less than $7,500, when the eligibility requirements are met. The city lists what is not eligible regardless of cost:
- Electrical, plumbing, mechanical or gas work.
- Structural work, including windows, doors and several exterior elements.
- Work on a property partly or fully within a flood hazard area.
- A project divided into smaller projects to stay under the threshold.
The exemption is not automatic: the city asks you to submit an exemption request after confirming that all criteria are met. The City of Kissimmee describes the same law and asks for a written exemption request approved before you start, kept on site during the work. Procedures differ from city to city, so check yours.
When does a cabinet project need a permit?
| Scenario | What the official pages indicate |
|---|---|
| New cabinets and countertops in the same location, same layout | Generally no permit in unincorporated Orange County |
| Moving the sink or dishwasher | Plumbing work: generally needs a permit |
| New outlets, under-cabinet lighting circuits, moving the range | Electrical or gas work: generally needs a permit |
| Removing or opening a wall | Structural work: generally needs a permit |
| Changing the layout of the kitchen | Outside the Orange County “same location” example; check before work starts |
| A closet or built-in with no trade work | Check with your department; the 2026 exemption may apply to eligible single-family projects under $7,500 |
How long does a custom cabinet installation take?
Every project moves through the same phases. The length of each depends on the size of the room, the finishes and whether other trades are involved. For a Novelli project, production and delivery take about 60 days from design approval; you receive the full schedule, including installation, when you approve.
- Consultation. We talk through the room, how you use it, your timing and your budget.
- Measuring. Exact measurements of walls, windows, ceilings and appliance positions.
- Design and approval. Layout, fronts, finishes and interior fittings, with a few meaningful revisions.
- Production. Panels are cut on CNC machines from the approved design, and edge banding is applied before assembly for a clean, finished look.
- Permits, if needed. Trade work such as plumbing or electrical is planned early, and any permit it needs comes before that work begins.
- Installation. Old cabinets come out, new cabinetry goes in, followed by countertops. Plumbing or electrical connections, where they apply, are trade work and may need a permit.
- Completion. A punch list, a walkthrough and the handoff.
Countertops add their own step: stone tops are usually templated after the cabinets are installed, so plan for a short period between cabinet installation and the finished kitchen.
How should you plan around the permit question?
Decide early whether the layout stays the same. Keeping the sink, range and dishwasher where they are is the simplest path. If you want to move them, plan the trade work and the permit from the beginning so production and installation follow without delays. During a design consultation we talk through which parts of your project involve other trades. For ideas, browse custom kitchens.
Sources, checked November 4, 2026: Orange County Fast Track Permitting FAQ; City of Orlando Residential Building Permit Exemption Guide; City of Orlando Residential Permitting Requirements; City of Kissimmee, Florida HB 803. This article is general information, not legal advice.
How a Novelli project is scheduled
Your project starts with a consultation and measuring, then a design you approve. From approval, production and delivery take about 60 days; installation is scheduled with you once the cabinetry arrives. If electrical or plumbing work is part of the project, we plan it into the timeline from the start.
- See it before you decide. We measure your room and present the design in 3D.
- Frameless, European-style construction. Full-overlay fronts, concealed hinges and full-extension drawers in every room we design.
- Made by a manufacturing partner founded in 1976. Panels cut on CNC machines from your approved design, with edge banding applied before assembly.
- Delivery in about 60 days from approval, with installation scheduled after delivery and a 5-year extended warranty*.
*Covers installation and TFL and MDF panels. Ask your designer to see the written warranty.
Frequently asked questions
Do I need a permit to replace kitchen cabinets in Orange County, Florida?
Orange County lists replacing cabinets or countertops in the same location, without changing the layout, among projects that generally do not need a permit. Remodeling, electrical, plumbing, mechanical and structural work generally does.
Do I need a permit to move my kitchen sink?
Moving a sink involves plumbing work, which generally requires a permit in Orange County and the City of Orlando.
Does the $7,500 exemption cover a new kitchen with trade work?
Trade work does not qualify: electrical, plumbing, mechanical, gas and structural work are excluded regardless of cost. Other eligible work valued under $7,500 on a single-family home outside a flood hazard area can qualify, and the exemption request goes to your building department before work begins.
Who pulls the permit for a cabinet project?
It depends on the work involved and who performs it. Ask during your consultation which parts of your project need a permit and who will handle each one.
How long does it take to install custom kitchen cabinets?
It depends on the size of the kitchen, the finishes and any trade work. The project moves through consultation, measuring, design, production and installation, and with Novelli production and delivery take about 60 days from design approval, with installation scheduled after delivery.
